Preferred Industrial Solar EPC & Utility BESS Contractor

Swastik Renewables engineers high-yield commercial solar arrays, multi-megawatt utility solar parks, and grid-scale battery storage (BESS) across Western Australia, the National Electricity Market (NEM), and global clean energy infrastructure.

  • Turnkey EPC, eBoP & In-House Distribution Engineering
  • 130 MWh Utility BESS & Multi-MW Solar Farm Execution
  • Commercial Green Debt & CAPEX Financing Structuring
Google 5.0 Rating
Clean Energy Council Accredited & WA Licensed
Strictly Industrial & Utility Scale
Swastik Industrial Solar Plant & Utility BESS Facility
200+ MW Utility Solar • 220+ MWh BESS Operational
WESTERN POWER WA
AEMO COMPLIANT
BP CLEAN ENERGY
TESLA ENERGY
SUNGROW POWER
SCHNEIDER ELECTRIC
ABB POWER GRIDS
SMA SOLAR

Your go-to engineering EPC for both commercial and mega utility scale

Backed by 7 years of heavy industrial contracting, we engineer rooftop and ground installations that slash operational tariffs with zero downtime.

Commercial & Industrial

Turnkey commercial rooftop and industrial ground-mounted arrays from 100 kWp to 2.5 MWp. In-house engineered distribution panels, power factor correction, network connection approvals, and commercial clean energy debt structuring.

Explore Solar EPC

Utility & Mega Scale BESS

50 MW to 300+ MW utility solar park execution and balance of plant (eBoP). High-voltage 33kV/400kV pooling substations, 130 MWh liquid-cooled BESS battery systems, and BP collaboration projects in the UK.

Explore Utility & BESS
349 MWp Limondale Utility Solar EPC Execution
“

"Swastik delivered turnkey utility solar balance of plant and 66kV substation integration with exceptional electrical precision and strict grid compliance."

AU
Utility Infrastructure Partner

WA & NEM Renewable Assets

Trusted Clean Energy & Electrical Contractor Since 2018

Established 7 years ago as a Class-A licensed electrical contracting firm, Swastik Enterprise built its reputation on heavy industrial switchgear, 433V PDB manufacturing, and 11kV/33kV substations.

In April 2025, we established Swastik Renewables to bring this electrical discipline directly into multi-hundred megawatt utility solar arrays and grid-forming battery storage (BESS) across Australia, India, and international markets.

Explore All 23 Projects

Getting the Clean Energy System You Need is Easy & Stress Free

Our streamlined 4-step engineering protocol guarantees seamless utility interconnection and maximum return on capital.

Step 01

Consultation

Comprehensive review of your factory connected load, tariff structure, and rooftop structural integrity.

Step 02

Engineering & Network Approvals

Detailed 3D irradiance modeling, single-line diagrams (SLD), and network service provider / AEMO grid compliance packages.

Step 03

Proposal & Green Debt

Bank-grade financial modeling with structured clean energy debt under commercial green finance and soft loan programs.

Step 04

Installation & Commissioning

Rapid turnkey construction, MV step-up substation wiring, bi-directional grid export synchronization, and SCADA telemetry.

Swastik Commercial Industrial Solar Rooftop Execution

Our Commitment to Service & Quality

Every megawatt of solar and every switchgear installation delivered by Swastik is engineered to exceed strict Clean Energy Council accreditation and AEMO & Western Power grid compliance. We guarantee zero production disruption to your operations.

Swastik
Master Electrical Engineer

Your Full-Service Clean Energy Contractor

Swastik delivers complete balance of plant across commercial rooftop arrays, utility solar farms up to 349 MW, high-voltage battery storage (BESS), and custom 433V PDB switchgear.

Request Audit
349 MWp Utility Solar Farm
349 MWp Utility Solar
Utility BESS Storage
130 MWh BESS Storage
Commercial Industrial Solar Rooftop Arrays
Commercial Solar Rooftops
11kV / 33kV Substations
11kV / 33kV Substations

Recent Projects & Execution Dossiers

Proven utility solar parks and grid-scale BESS facilities across Australia and global hubs.

View All (14)

Industrial Solar CAPEX & Green Debt Calculator

Model your factory's exact solar sizing, bank EMI, power bill reduction, and 25-year cashflow surplus.

250 kW
Contracted demand or sanctioned kVA.
$ 15,000 / mo
Current industrial power cost.
80% Debt
Commercial green debt & clean energy soft loan funding.

Unlock Detailed Financial Audit

Enter your company specifications to view live monthly EMI, tariff savings, and simple payback.

Recommended Solar Sizing

250 kWp Industrial Plant

Net Monthly Surplus Cashflow
+$ 4,200 / mo
Turnkey CAPEX:
$ 285,000
Monthly Power Saved:
$ 7,850 / mo
7-Year Loan EMI:
$ 3,650 / mo
Simple Payback:
3.2 Years
— REACH OUT

Let's Discuss Your
Energy Transition

Whether you need an immediate site feasibility study or wish to speak with our engineering directors, our team is ready to assist you.

Perth Corporate Office

Level 14, 197 St Georges Terrace,
Perth WA 6000, Australia

View on Google Maps →

Phone & Direct Lines

General: +61 8 9200 4880

Email Channels

Inquiries: perth@swastik.au

Send an Inquiry

Proven Track Record

Utility Solar & BESS Portfolio (14 Projects)

Australian utility solar parks, commercial BESS facilities, and global clean energy partnerships.

SOLAR PARK AU • 2.0 MWp

Pilbara Solar & Remote Microgrid Facility

Newman, Pilbara Region, Western Australia

2.0 MWp ground-mounted solar array engineered for harsh cyclone and red-dust mining conditions. 1P single-axis tracking with integrated 33kV mine-substation synchronization.

Capacity: 2.0 MWp Location: Pilbara WA Interconnect: 33 kV
SOLAR PARK AU • 2.5 MWp

Geraldton Industrial Port Solar Park

Geraldton Port Industrial Corridor, Western Australia

Turnkey 2.5 MWp industrial solar facility delivering zero-emissions port logistics power. Features salt-spray resistant anti-corrosion mounts and automated inverter curtailment.

Capacity: 2.5 MWp Location: Geraldton WA Grid: Western Power 33 kV
SOLAR PARK AU • 1.8 MWp

Kalgoorlie Goldfields Mining Solar Array

Kalgoorlie-Boulder Region, Western Australia

1.8 MWp industrial solar array coupled with automated diesel-offset controllers to power heavy rock crushing and extraction operations.

Capacity: 1.8 MWp Location: Goldfields WA Off-Grid: Hybrid Sync
AGRI-SOLAR AU • 2.0 MWp

Swan Valley Agri-Industrial Solar & Cold Storage

Swan Valley, Western Australia

2.0 MWp bifacial solar farm installed across agro-industrial processing facilities, integrated with smart chilled-water thermal balancing to offset peak energy tariffs.

Capacity: 2.0 MWp Location: Swan Valley WA Tariff: Peak Shaving
SOLAR PARK AU • 2.0 MWp

Balranald Industrial Feeder Solar Park

Balranald, New South Wales, Australia

Turnkey 2.0 MWp ground-mounted industrial solar park with single-axis tracking, dedicated 33kV distribution feeder step-up, and automated inverter curtailment controls.

Capacity: 2.0 MWp Location: Balranald NSW Feeder: 33 kV Essential
SOLAR PARK AU • 1.9 MWp

Murray Basin Agro-Pumping Solar Park

Sunraysia Region, Victoria / NSW Border

1.9 MWp ground-mounted solar array directly coupled with multi-megawatt high-pressure irrigation and horticultural processing plants under regional DNSP rules.

Capacity: 1.9 MWp Location: Murray Basin Inverter: IP66 Central
UTILITY FARM • 349 MWp eBoP

Limondale Utility Solar Farm (Contractor eBoP)

Balranald, New South Wales, Australia

Contractor electrical balance of plant (eBoP), DC harness termination, MV power transformer integration, and commissioning support on premier Australian utility solar farm.

Array: 349 MWp Location: Balranald NSW Infeed: 33kV / 132kV
UTILITY BESS AU • 130 MWh

Tully Mill Utility BESS & Grid Support

Tully, Far North Queensland, Australia

Turnkey balance of plant and high-voltage grid interconnection for a 130 MWh utility-scale battery energy storage system with sub-80ms FCAS contingency support.

Storage: 130 MWh Location: Tully FNQ Response: < 80ms FCAS
INDUSTRIAL BESS AU • 100 MWh

Kwinana Industrial Substation BESS

Kwinana Industrial Area, Western Australia

100 MWh utility-grade battery system providing industrial peak shaving, rapid contingency frequency response, and Western Power SWIS transmission stabilization.

Storage: 100 MWh Location: Kwinana WA Grid: 132 kV SWIS
UTILITY BESS AU • 80 MWh

Collie Regional Grid Stability BESS

Collie Transition Corridor, Western Australia

80 MWh / 40 MW grid-forming battery facility engineered with virtual synchronous machine (VSM) algorithms to deliver system strength and synthetic inertia.

Storage: 80 MWh / 40 MW Location: Collie WA Mode: Grid-Forming VSM
MINING BESS AU • 50 MWh

Pilbara Mining Electric Haulage BESS

Tom Price Mining Corridor, Western Australia

50 MWh heavy-duty battery installation mitigating massive electric haulage charging spikes across mining rail and automated pit infrastructure.

Storage: 50 MWh Location: Pilbara WA Duty: Heavy Transient
MICROGRID BESS AU • 25 MWh

Wongan Hills Agricultural Microgrid BESS

Wheatbelt Region, Western Australia

25 MWh decentralized battery facility providing multihour backup and network stability to rural agricultural distribution feeders during fringe-of-grid events.

Storage: 25 MWh Location: Wheatbelt WA Feeder: 22 kV SWIS
BESS UK • 40 MWh (BP COLLAB)

BP Pulse EV Mega-Hub BESS Integration

Midlands Transport Corridor, United Kingdom (In Collab with BP)

40 MWh / 20 MW high-rate battery storage system deployed in collaboration with BP. Buffers ultra-fast EV charging plazas from local DNO substation limits.

Storage: 40 MWh / 20 MW Partner: BP Collab Grid: 33 kV DNO
BESS UK • 50 MWh (BP COLLAB)

BP Tees Valley Industrial Net-Zero BESS

Teesside Industrial Cluster, United Kingdom (In Collab with BP)

50 MWh / 25 MW grid-forming battery facility executed in collaboration with BP. Provides rapid frequency containment reserve to the UK National Grid ESO.

Storage: 50 MWh / 25 MW Partner: BP Collab Grid: 33 kV Northern Power
Plant Sizing Audit

Unlock Detailed 25-Year Financial Report

Please provide your industrial plant details to generate your customized bank debt and ROI model.

Visiting from India?

Switch to our dedicated Indian Corporate & Industrial Portal (renewable.swastik.au/in) for Gujarat DISCOM regulations, Solar EPC & O&M contracts, and industrial CAPEX solar financing.

Switch to Indian Portal